Xuzhou phaeton steel structure engineering co., LTD. Mainly in the processing of the grid rack, grid rack accessories. Bolt ball, etc., these years continue to expand, products, quality are recognized by customers. In October, the main frame of ningbo international auditorium was successfully completed through phaeton construction.
|
Prev:Sichuan xuanhan bus station frame main body completed
Next:Screw fastener loose how to do? |
Back to list |

Huiteng News
/ NEWS
Construction and installation project of sports arena grid structure
2026-05-26Xiangyang Technician College Swimming Pool Grid Manufacturing and Installation Project
2026-05-26Xiangyang Technician College Gymnasium Grid Manufacturing and Installation Project
2026-05-26Network structure project of the training base of the Fire Rescue Brigade in Guyuan City, Ningxia
2026-05-26
Industry News
/ NEWS
Corrosion treatment and anticorrosion method of net frame
2019-04-02The main body of longyan convention and exhibition center was built
2018-11-30Selection of fire retardant coating for steel structure and its brushing process
2019-09-04The second national steel structure bridge construction technology conference
2018-10-10All rights reserved:Xuzhou Huiteng Space Structure Co., Ltd.
Design:Winsharing