Guangdong zhaoqing xiaopeng new energy automobile grid stamping workshop covers an area of 20566 square meters. This project has a large span and a large load, and adopts the construction method of bolt ball and welding for mutual matching type grid structure. It adopts the method of block hoisting, air butt lifting (" plus similar "to" huiteng grid structure "adds luster to the national new energy project).





|
Prev:Yancheng digital industrial park exhibition hall grid
Next:Xiangyang Technician College Gymnasium Grid Manufacturing and Installation Project |
Back to list |

Huiteng News
/ NEWS
Construction and installation project of sports arena grid structure
2026-05-26Xiangyang Technician College Swimming Pool Grid Manufacturing and Installation Project
2026-05-26Xiangyang Technician College Gymnasium Grid Manufacturing and Installation Project
2026-05-26Network structure project of the training base of the Fire Rescue Brigade in Guyuan City, Ningxia
2026-05-26
Industry News
/ NEWS
Corrosion treatment and anticorrosion method of net frame
2019-04-02The main body of longyan convention and exhibition center was built
2018-11-30Selection of fire retardant coating for steel structure and its brushing process
2019-09-04The second national steel structure bridge construction technology conference
2018-10-10All rights reserved:Xuzhou Huiteng Space Structure Co., Ltd.
Design:Winsharing