First, select the original data, incomplete original data is not satisfied with the processing of goods, produced goods can not be satisfied with the grid project, if the incomplete goods applied to the construction of the grid, will directly affect the construction of all projects.
Second, chemical analysis, on the original data all functions of the analysis, discharge the function of the interim bad original data, to ensure excellent data.
Third, the billet blanking, in the industrial furnace for commodity heating softening, after the blank strike skills, to create a fundamental bolt ball.
Fourth, the inspection of the blank bolt ball, the view of the ball is analyzed, qualified goods to reach the reference hole.
Fifth, the deep processing of the viewpoint of the bolt ball, check the viewpoint and thread, shot blasting, manufacturing molding goods, the end of all the bolt ball frame processing process.
|
Prev:What performance should net rack fittings have?
Next:How about the corrosion resistance of the rack accessories |
Back to list |

Huiteng News
/ NEWS
Construction and installation project of sports arena grid structure
2026-05-26Xiangyang Technician College Swimming Pool Grid Manufacturing and Installation Project
2026-05-26Xiangyang Technician College Gymnasium Grid Manufacturing and Installation Project
2026-05-26Network structure project of the training base of the Fire Rescue Brigade in Guyuan City, Ningxia
2026-05-26
Industry News
/ NEWS
Corrosion treatment and anticorrosion method of net frame
2019-04-02The main body of longyan convention and exhibition center was built
2018-11-30Selection of fire retardant coating for steel structure and its brushing process
2019-09-04The second national steel structure bridge construction technology conference
2018-10-10All rights reserved:Xuzhou Huiteng Space Structure Co., Ltd.
Design:Winsharing