1. Materials for building materials.
2. Whether the pad iron under the bottom plate of the column or beam is stable; Whether the column and beam are vertical; Whether the bolts are tightened, etc.
3. Whether the space of column bottom plate and foundation top surface should be poured twice.
4. Whether the connecting bolts conform to the standard.
5. whether there is unqualified weld.
6. besmear brushs of times number and thickness whether accord with relevant regulation.
7. Whether the steel structure should be rustproof and corrosion-proof.
8.after the installation of color board, whether to do waterproof wall board joints.
|
Prev:Selection of fire retardant coating for steel structure and its brushing process
Next:No more |
Back to list |

Huiteng News
/ NEWS
Construction and installation project of sports arena grid structure
2026-05-26Xiangyang Technician College Swimming Pool Grid Manufacturing and Installation Project
2026-05-26Xiangyang Technician College Gymnasium Grid Manufacturing and Installation Project
2026-05-26Network structure project of the training base of the Fire Rescue Brigade in Guyuan City, Ningxia
2026-05-26
Industry News
/ NEWS
Corrosion treatment and anticorrosion method of net frame
2019-04-02The main body of longyan convention and exhibition center was built
2018-11-30Selection of fire retardant coating for steel structure and its brushing process
2019-09-04The second national steel structure bridge construction technology conference
2018-10-10All rights reserved:Xuzhou Huiteng Space Structure Co., Ltd.
Design:Winsharing